AI is a tool.
Organizations choose the objective, data, limits, and deployment. They remain responsible.
Future AI
Position paper
Use it where measured savings exceed its load. Regulate by risk. Keep people accountable.
Short version
Updated July 26, 2026.
Organizations choose the objective, data, limits, and deployment. They remain responsible.
Start with a baseline. Include the full cost. Measure the result.
Higher stakes require stronger testing, records, review, and human authority.
Where we stand
Start where the current waste can be measured.
Disclose electricity, cooling, infrastructure, and local impact.
The deploying organization owns the outcome.
Contracts should require a baseline, method, records, and results.
Governance
A note-taking tool and a system that affects health, employment, or access should not face the same rules.
Set access controls, review outputs, and protect data.
Keep logs, monitor errors, and provide an appeal path.
Keep human authority, clear liability, and an incident plan.
Energy
Electricity, cooling, and local infrastructure belong in every net-benefit claim.
U.S. data center electricity use in 2023.
DOE projection for 2028.
Questions
Direct answers to the obvious objections.
No. Every claim must include electricity, cooling, infrastructure, and local effects. If the total cost exceeds the measured benefit, the project fails the test.
The organization that deploys the system. A vendor or model cannot absorb legal or operational responsibility.
Then the contract must require access to records, a before-and-after baseline, and an outside audit path.
Measure total use and total output, not efficiency per task. A lower unit cost is not a net benefit if overall cost rises.
This paper does not predict job totals. Any system that affects employment or access needs records, review, an appeal path, and human authority.
Yes. Clear Frameworks used AI tools to research and build the campaign. That use is disclosed, the sources are public, and the campaign applies the same measurement standard to itself.
The standard
Before anyone calls a project efficient, ask for the baseline, total cost, and measured result.